7. Embargo Period Date (MA)¶
datacite:date
7.2. Definition and Usage Instruction¶
Dates relevant to describe an embargo period.
A date associated with an event in the life cycle of the resource. Typically, Date will be associated with the creation or availability of the resource. Recommended best practice for encoding the date value is defined in a profile of ISO 8601 [W3CDTF] and follows the YYYY-MM-DD
format.
Remarks
- introduced as info:eu-repo/date/embargoEnd/[YYYY-MM-DD] in previous versions of the OpenAIRE Guidelines
- this version of the application profile adopts the Date element in combination with dateType attributes from DataCite MetadataKernel v4.1 which replaces the
info:eu-repo/date/EmbargoEnd
syntax.
When Access Rights (M) is set to:
<datacite:rights uri="http://purl.org/coar/access_right/c_f1cf">embargoed access</<datacite:rights>
the start and end date of the embargo period must be provided.
Do Not Confuse With
- Publication Date (M) (Use
datacite:date
for Publication Date related to the resource.)
7.2.1. Property date (MA, 2)¶
Use the date of the embargo start as value in one property and the date of the embargo end in the other property.
7.3. Example¶
1 2 3 4 | <datacite:dates>
<datacite:date dateType="Accepted">2011-12-01</datacite:date>
<datacite:date dateType="Available">2012-12-01</datacite:date>
</datacite:dates>
|